January 11, 2020 0 Comment

Each window and door opening will require pieces of j-channel. Step each of these on all 4 sides and add that length to your order of j-channel. J-channel can be found in 10′ lengths. Ok Lets start. Using your tripod, level and a helper, you must develop a level line all the way around the building to follow. This is where your starter strip is going to be nailed. Do not attempt and determine it with a tape. If the line is not level all the way around, when you turn a corner the siding lines will not match. Buildings are not perfectly level, ever.

Image result for sliding door DIY

You create a false appearance of level, by setting the line and starting your siding on that mark. You may find you have to hold the line down below the plywood a little so as not to have the line come out above the bottom of the plywood elsewhere. The starter strip might hang down below the plywood. Visit website for windows and siding. As soon as you have a level line where no part of the siding will begin above the plywood bottom, you might nail your starter strip to the building. Starter strip is metal so use your snips to cut them. Nail 16″ on center with a nail constantly on each end. Usage as long lengths as possible to prevent joints. The starter strip when installed properly will lay flat on the building with the bottom pointing far from the structure, not towards it. Now install your corners. Corners are pre-made, color coded and been available in 10′ lengths. Hold the corner somewhat listed below the start strip when nailing. This will assure the bottom of the siding is fully within the corner piece and looks nice and neat. Nail the corners 16′ OC. Your siding will end in these corners.

Various producers alter colors so look around and make certain the color you selected is easily available and in stock if you require additional pieces. Siding is available in different sizes and patterns too. Cottage siding, 4 over 4, 5 over 5, 8″ as well as other designs are readily available. Some companies offer siding that look like shake shingles or rounded shake shingles that can include a dramatic effect to a plain gable end of a home. 4 over 4 siding means that when you see the siding, it seems 2 pieces of 4″ high boards, one over the other. 5 over 5 is 2 5″ boards and so on. Smaller sizes makes larger homes look shorter and bigger sizes make a smaller home look taller. I have actually seen siding set up on a slant however this is actually tricky and ought to not be tried out you’re your task. Leave that for later.

The first piece of siding locks onto the starter strip and getting it over a lot of joints can be a bear to do. If your setting up nail-on insulation this is the time to do so. Cover 4-5-6 feet up the wall to begin. Keep the joints as tight as possible. Piece of siding. Siding can be found in 12′-‘6″ lengths so you wish to determine the least waste. When one piece of siding laps over the other, an open joint is developed. Face the open end of the joint far from the roadway or dominating winds. Set up the first piece by first placing it below the starter strip and pulling upwards till the bottom groove on the siding locks onto the starter strip. Do not pull the siding upwards to such a point you actually put pressure on the starter strip. The siding should sit loosely versus the starter strip. Nail the siding 16″ OC, putting your nails in the middle of the slots in the leading edge of the siding. NO NOT DRIVE THEM HOUSE! You want the siding to be able to relapse and forth with temperature modifications. It does expand and contract. If you drive the nails house and lock the siding in place, the siding will buckle. When installing your siding in warm weather and the siding is hot, hold the end of the siding approx. 1/2″ from completion of the corner slot. When the siding is cold, hold completion of the siding approx. 1″ from completion of the slot so there is room to expand.

Installation-You must take mindful measurements of all the locations that you are going to cover with siding. Step the length and width (or height) of each location and record the measurements. Unless there is an over abundance of windows, disregard them for now. Do all the mathematics by increasing the lengths by the widths to get the square feet of siding you require. Use even video, not inches. If all your measurements pertain to 1600 square feet, each box of siding contains 2 square, so you need an overall of 8 boxes. There are no 1/2 boxes. 1700 square feet you need 9 boxes. You will need extra siding in any case for cuts and repair work in the future. Starter strip is determined one time around the base of the walls. 30′ x 30′ building uses 120 lineal feet of starter strip. Soffit J and other trims are a little more difficult to figure. Depending upon how your soffit panels are to be installed, you need a minimum of enough F-bead to go all the way around the building as soon as if you utilize it just on the wall. If you utilize it two times, once on the fascia and as soon as on the wall, the amount doubles. I use F-channel just when on the wall above my siding. I end the siding versus the soffit F-channel, utilize a J-channel at the top of the siding with a termination strip and siding punch and after that flex my metal fascia on an L-angle to cover both the fascia board and completion of the soffit panels. Neat, tidy and less expensive.

Vinyl siding is being installed today on houses, business structures, sheds and any structure that has locations that are exposed to weather. Siding is available in both aluminum and vinyl materials but vinyl is far more popular today. Siding can be found in a series of colors in addition to accessories to match or contrast in color to the siding. Prior to buying your siding, take the time to look around at other homes or company’s to see how they did their color matches and trims. It may provide you some ideas you might not have actually thought about doing with your project.

TOOLS REQUIRED-Measuring tape, pad, pencil, ladders, scaffolds, pair of sawhorses, a 14′ long planks for sawhorses, saw, Quick Square, 4′ level, razor knife and blades, siding punch, pair of Snips, hammer, tripod and level (lease at local rental outlet). Scaffolding with hand rails might be essential too.

PRODUCTS- Siding, starter strip, J-bead, Vinyl corners, F-bead, insulation backer board, aluminum nails.